Bitumen 80/100
Softer penetration grade for cooler climates & surface dressing
Bitumen 80/100 carries a penetration at 25°C of 80–100 dmm and a softening point of 45–52°C — a softer, more ductile binder than 60/70, with ductility at 25°C of ≥ 100 cm, flash point ≥ 225°C and solubility ≥ 99.0%. CBIL brokers it against EN 12591 (the 70/100 band), ASTM D946 and the equivalent national road-authority specs, with the full penetration, softening point and RTFOT-residue panel certified by SGS or Intertek at load port. The lower softening point is not a defect: it is the whole reason the grade exists, and it is what your specification is buying.
A buyer picks 80/100 over 60/70 when low-temperature performance matters more than high-temperature rut resistance — cooler and temperate climates, cold-weather laying windows, and pavements where thermal cracking is the failure mode being designed against rather than deformation. It is also the preferred feedstock for cutback bitumen (MC/RC grades) and for surface dressing and chip seal work, because the softer binder wets aggregate at lower mixing temperatures and holds chippings through the first winter. Specify 60/70 instead if your pavement sees sustained high summer temperatures or heavy commercial traffic, where 80/100 will rut. Supply is arranged from UAE, Bahrain, Iran and Singapore loading points on FOB, CFR and CIF terms, in new steel drums (150/180 kg), 300 kg jumbo bags, bitutainers or hot-bulk vessel.
Indicative reference
$435–465 USD / MT
as at September 2026
Reference level only — not an offer, and reviewed quarterly. Levels shown are as at September 2026. Firm pricing is quoted per RFQ, subject to volume, terms and inspection.

Typical Specification
Specifications are indicative and adjusted to the agreed contract and destination requirements. Final spec confirmed on COA / SGS.
Available Grades
Applications
- Cooler-climate road construction
- Surface dressing & chip seal
- Cutback bitumen feedstock
- Asphalt patching & maintenance
Category
Petroleum & Energy
Incoterms
FOB · CFR · CIF
Pricing basis
USD / MT
Inspection
SGS / Intertek at load port
Bitumen 80/100 — buyer questions
Why is 80/100 softer than 60/70, and when does that help?
Penetration measures how far a standard needle sinks into the binder at 25°C, so a higher number is a softer binder. That softness buys low-temperature flexibility, which is what you want in cooler climates, in cold laying conditions and where thermal cracking rather than rutting is the design concern. In hot climates under heavy traffic the same softness becomes rutting, which is why the Gulf and South Asia default to 60/70.
Is 80/100 the right base for cutback bitumen?
It is the usual choice. The softer base cuts back to MC and RC grades with less solvent and wets aggregate at lower temperatures, which is why surface dressing and chip seal contractors specify it. If you are producing cutback, tell us the target grade and we will confirm the base penetration your blender needs.
Can you supply 80/100 in drums for a small first order?
Yes. One 20ft container of 150 kg or 180 kg new steel drums is a workable starting lot for buyers without heated storage, and it is the format most distributors begin with. We will confirm the exact drum count and net weight against the allocation once you nominate the discharge port.
Ready to source Bitumen 80/100?
Send your quantity, specification, preferred Incoterms and destination port. We'll verify supply and respond with a workable offer — usually within one business day.
Have Bitumen 80/100 to sell? Submit an offer — we'll match it against live buyer demand.